5.1 FILLING BOILER MANUALLY
NOTE
This operation must be carried out with the machine
turned off.
All models ADONIS are equipped with a level gauge to
keep the water level inside the boiler constant.
When using the machine for the first time, it is advisable
to fill the boiler by hand to avoid damaging the electrical
resistor and turning on the electronic protection.
If this should happen, just turn the machine off and then
start it up again to complete its loading procedure (see
chapter "MACHINE FUNCTIONS MESSAGE – LEVEL
ERROR").
46
To fill the boiler manually for the first time, proceed
as follows:
• remove the grid and the drip tray;
• remove the protective metal sheet by unscrewing
the two side screws "A" as shown in the following
illustration;
A
• turn the manual "A" level tap so that water will
enter the boiler;
• after about 45 seconds, shut off the valve "A" as
illustrated in the following figure;
• switch on the machine (see the chapter
Fig. 7
"SwITCHING ON THE MACHINE").
A
Fig. 8

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADONIS 3 gruoups and is the answer not in the manual?

This manual is also suitable for:

Adonis 2 gruoups

Table of Contents