Steps For Finalizing The Installation - Lopi berkshire GS2 Owner's Manual

Hide thumbs Also See for berkshire GS2:
Table of Contents

Advertisement

Installation

Steps for Finalizing the Installation

1. Remove the glass (see page 25).
NOTE:
If using propane (LP) convert the appliance prior to installing the logs.
2. We recommend you purge the gas line at this time (with the glass removed). This allows gas to be
detected once it enters the firebox, ensuring gas does not build up.
3. Make sure the accent light bulb is in place.
NOTE: Take care to not touch the bulb with your fingers – use a cloth or paper towel).
4. Install the four AA batteries (included in the owner's pack) into battery holder (see the illustration
below). The AA batteries act as a power backup in case the household (AC) power goes out. Install
the 9v battery (included in the owner's pack) into control panel light assembly (see the illustration
below). The battery holder is held in place with Velcro and may be removed for easier access.
© Travis Industries
(for qualified installers only)
4141208
23
100-01399

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents