Lopi berkshire GS2 Owner's Manual page 45

Hide thumbs Also See for berkshire GS2:
Table of Contents

Advertisement

Optional Equipment
Remove and discard the screws (see "a" below) holding the stock regulator in place (see "b" below).
8
Remove the stock regulator and gasket (see "c" below). Place the LP regulator in place, making sure
the pre-fitted gasket (see "c" below) is in place.
NOTE: There is a label on the base of the regulator knob indicating regulator type (NG or LP).
Secure the regulator with the screws included with the regulator – tighten to 25 lb-in of torque. Place
the included label on the valve body where it can be easily seen to insure proper identification.
NOTE: Leak test this area after the heater is installed, gas is connected, and the main burner
is lit.
9
Make the gas line connection, bleed the gas line (if applicable), start the heater and thoroughly leak-
test all gas connections and the gas control valve.
© Travis Industries
(for qualified installers only)
4141208
45
100-01399

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents