US Shift 4R70W Installation And Operation Manual page 6

Hide thumbs Also See for 4R70W:
Table of Contents

Advertisement

(CARBURETED AND MECHANICALLY-INJECTED DIESEL)
Step 1: Ground
Connect the ground wire (Pin 15 Black) from the
Quick 4 directly to the battery ground post or
negative battery cable. Do NOT connect the
ground wire to sheet metal or other ground
sources. The Quick 4 MUST be connected
directly to the battery ground post or negative
battery cable.
Step 3: Throttle Position Sensor
Attach the 3 Throttle Position wires from the
Quick 4 to the Throttle Position Sensor. Pin 16
Black is dedicated ground. Pin 11 Orange is +5v
reference feed. Pin 3 Dark Green is the position
sensor signal.
See the "Throttle Position Sensor" section for
details.
6
CONNECTING THE ESSENTIALS
Connect the power wire (Pin 9 Red with 7.5
Amp fuse) from the Quick 4 to ignition-
switched power wire. Do NOT use accessory-
switched power.
Step 2: Power

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4r75Aod-e

Table of Contents