Once the panel is installed, connected and programmed, there are several pro-
gramming commands that can be used to test it while in Programming Mode.
These are listed below (Press ENTER to stop any test.):
To Test
Engineer Log
External Sounder
Strobe
Internal Sounder
Output 1
Walk Test
Testing
Key in: Followed by:
90
4 see earlier events.
5 to see more recent events.
ENTER to quit log. (15 events max.)
91
ENTER to stop test.
92
ENTER to stop test.
93
ENTER to stop test.
95
ENTER to stop test.
97
ENTER to stop test.
496219 Issue 1
23