installation
|
26
E33-10
6. Reverse step1.
5. With the Inlay in position, place the mesh screen over the inlay.
NOTE: The flush side of the mesh screen should face the inlay.
7. Install the Vignette frame with Inlay onto the 2 hooks provided on
the unit.
26 |
E33-10 FPI Direct Vent Gas Insert