Setting Up The System; Pre-Installation Requirements - Gateway GT110 Series User Manual

Table of Contents

Advertisement

14

Setting up the system

Pre-installation requirements

Selecting a site
Before unpacking and installing the system, select a suitable site for the
system for maximum efficiency. Consider the following factors when
choosing a site for the system:
Near a grounded power outlet.
Clean and dust-free.
Stable surface free from vibration.
Well-ventilated and away from sources of heat.
Secluded from electromagnetic fields produced by electrical devices
such as air conditioners, radio and TV transmitters, etc.
Checking the package contents
Check the following items from the package:
GT110 system
Gateway Smart Setup DVD Pack
GT110 accessory box
If any of the above items is damaged or missing, contact your dealer
immediately.
Save the boxes and packing materials for future use.
2 System setup

Advertisement

Table of Contents
loading

Table of Contents