Manage On/Off Cod Processors Hmc Activation Window - IBM p5 590 System Handbook

Table of Contents

Advertisement

consecutive hours of testing or production, the result is four processor usage
days.
If the same client activates two of the previously activated processors in the
same 24-hour period, the result is six processor usage days since a new
measurement day begins each time processors are activated.
Managing On/Off Capacity on Demand resources
The hardware management console is used to manage and enable resources
temporarily on a p5-590 or p5-595 machine. After the On/Off enablement code
has been obtained and entered, the client can request activation of the desired
number of On/Off CoD resources for the specified number of usage days.
Figure 4-4 provides a snapshot of the HMC activation window used to define the
number of processor resources and days. The activation window for memory
resources is almost identical.
Figure 4-4 Manage On/Off CoD Processors HMC Activation window
Once the user has selected the desired amount and usage days for the On/Off
capacity, a summary will be presented as seen in Figure 4-5 on page 98. This
summary window and associated legal text will only be presented when
activating On/Off CoD resources; it will not be displayed when the resources are
Chapter 4. Capacity on Demand
97

Advertisement

Table of Contents
loading

This manual is also suitable for:

P5 595

Table of Contents