Installation For Pure Tech 250 - Pure Water PTSF-2510-10 Owner's Manual

Pure tech 2500
Table of Contents

Advertisement

First turn water supply off.
Make a cut in your line AFTER your pressure tank.
Install first ball valve AFTER your pressure tank. (see figure a on page 3)
Teflon tape threads on each end of PURE TECH 250.
Place rubber o-ring seal in notch then place adaptation cap and screw down tightly.
Securely tighten, but be careful not to strip the threads.
Install required plumbing bushings in PURE TECH 250 that matches your pipe size.
Install PURE TECH 250 after ball valve. With this installed you will be able to cut
the water supply off later to add chlorine.
Install spigot after the PURE TECH 250. This will allow you to de-pressurize the
unit.
Install second ball valve after spigot. This will allow you to stop the water from back
feeding from any equipment.
DO NOT INSTALL CHLORINE YET.
Go to Page 7 section 5 and continue with installation of PURE TECH 3000si
Tech Support: 1-888-989-7873

Installation for PURE TECH 250

PURE WATER TREATMENT, INC.
Page 28

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ptsf-2510-13

Table of Contents