PUTTING THE PRODUCTS INTO OPERATION

6.1 CONNECTION TO THE SYSTEM

Connection to the system is performed in a usual manner - see the below given installation dimensions of
products. Recommended connection of the boiler to the heating system – see pict. no. 40 - 52.
Important:
With boilers KP 62, KP 62E – it is important to have both water output connect!
Picture No. 23 Installation dimension of boiler
Filling the system with water takes also place in a standard way and the following principles have
to be adhered to at the same time:
- water for the heating system has to be clean, free from any admixtures. Its hardness has to meet the Czech
standard ČSN 07 7401 / 1992 – if the hardness does not meet this standard, it has to be treated with a
corresponding softener.
- if extremely hard water is used, there is a risk of "scale" formation - which is to the detriment of heat exchange
and causes tension in the boiler body and this tension may cause damage to the homogeneity of the body.
Attention!
Impurities and sediments which might jeopardize failure-free operation of pumps have to be thoroughly
rinsed before the system is finally filled with water.