Outline Of Preparation Procedure Before Operating The Ecr - TEC MA-1450-1 Series Owner's Manual

Hide thumbs Also See for MA-1450-1 Series:
Table of Contents

Advertisement

6. OUTLINE OF PREPARATION PROCEDURE BEFORE OPERATING THE ECR

6.
OUTLINE OF PREPARATION PROCEDURE BEFORE
OPERATING THE ECR
This chapter shows the outline of set-up procedure of the ECR before actually starting the ECR operation.
Turn the POWER SWITCH to OFF before connecting the power cord.
1
Remove the cash register from the carton, referring to Chapter "2.
Unpacking". And take out all the parts and accessories.
2
Remove the tapes and seals for holding parts or protecting the
register surfaces.
3
Plug the power cord of the register into a wall outlet. Make sure
that the outlet voltage matches that of the power required for the
register.
4
Insert the REG key into the Control Lock.
5
Turn the Mode Lock to the REG position with the power ON.
6. OUTLINE OF PREPARATION PROCEDURE BEFORE OPERATING THE ECR
WARNING!
6-1
EO1-11095
(1)
(2) (3) (7)
(4)
(5)
(6)
(8)
MGR
X
-
REG
Z
SET
MGR
X
-
REG
Z
SET

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents