1.3 Technical Support and General Information

For technical support call 1-888-SECUTRON, or email techsupport@secutron.com
For general product information visit the Secutron web site: www.secutron.com.

1.4 System Verification

The complete fire alarm system must be verified for proper installation and operation when:
•the initial installation is ready for inspection by the Local Authority Having Jurisdiction;
•any system component is added, changed or deleted;
•any programming changes are made;
•system wiring has been altered or repaired;
•system failure due to external influences such as lightning, water damage or extended power outages has
occurred.

1.5 Standby Power

The MR-2602 provides standby battery support for lead-acid rechargeable batteries. The required capacity of
the standby batteries must be calculated using the charts and tables within this manual for the period as
required by national or local codes and standards. Even though the calculation table within this manual
includes a safety margin, lead-acid batteries commonly used for standby can have variable capacity as a
result of age and ambient conditions. Periodic inspection for damage and the batteries' ability to support the
attached equipment is highly recommended.

1.6 Battery Maintenance

The two 12V sealed lead-acid batteries should be replaced after each period of 3 to 5 years of normal service.
If the Battery Trouble indicator activates, obtain required service.