Equipment Compartment - HotSpring Gleam Owner's Manual

Hide thumbs Also See for Gleam:
Table of Contents

Advertisement

than 3 ppm, superchlorinate the spa water by adding 1½ teaspoons
of chlorine (sodium dichlor) per 250 gallons (950 liters) of spa water.
Activate the clean cycle again to circulate the spa water for another
ten-minute period.
8. ROTATE THE DIVERTER LEVER(S) TO OPPOSITE
POSITION.
Activate the clean cycle as described in step 5. Test the
spa water for Free Available Chlorine (FAC) residual. If the residual
is between 3 and 5 ppm on the test strips (found in the test kit) go
on to the next step. If the residual is less than 3 ppm, superchlorinate
the spa water by adding 1½ teaspoons of chlorine (sodium dichlor)
per 250 gallons (950 liters) of spa water. Then Activate the clean
cycle again to circulate the spa water for another ten-minute period.
Repeat this procedure until both diverter lever(s) operating positions
have been tested.
G
S
ettInG
tarted

EQUIPMENT COMPARTMENT

The illustration below is to be used as a reference
only (your spa may look different). The equipment
compartment is located behind the front panel of the spa
below the control panel.
EQUIPMENT COMPARTMENT
1. Wavemaster
2. No-Fault
heater
®
3. Silent Flo 5000
4. IQ 2020
®
control box
* This drain may be reversed with other drain depending on your spa, the Main drain will always have a shut-off valve attached.
Getting Started
1
3
6
®
jet pump
®
circulation pump
9. RECHECK
the Total Alkalinity (TA) at 80 ppm, Calcium Hardness
(CH) at 100 ppm, then spa water pH at between 7.2 and 7.8. using a
FRESHWATER 5-way test strip.
Make sure you adjust your Total Alkalinity first, as
IMPORTANT:
an out-of-balance condition will affect your ability to adjust the pH
correctly, and will prevent the sanitizer from operating effectively.
The spa is ready for use when the spa water has circulated
through each diverter lever operating position and the chlorine
level remains between 3 ppm and 5 ppm.
10. TEST WATER WEEKLY OR BEFORE EACH TIME
THE SPA IS USED
8
5
5. Ozone injector
6. *Main drain (with shut-off valve)
7. *Secondary drain
8. Bonding terminal
Page 7
4
1
2
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents