Pre-Delivery Instructions
Please take the time to read this booklet carefully, as it will provide you with the information you will need to ensure
the safe, secure, and timely installation of your new spa. The following sections are guidelines on how to prepare for
delivery and set-up of your new spa. Specifically covered are site selection, delivery access, ground preparation, and
electrical requirements.
Remember to carefully read the Owner's Manual that accompanies your spa, and to complete the Warranty Card
within 10 days of delivery. These items, along with other valuable information, will be found in the Owner's Package
which has been placed in the equipment compartment of your spa, where you will also find its serial number.
Watkins Manufacturing Corporation reserves the right to change features, specifications and design without
notification and without incurring any obligation.
DATE PURCHASED: _________________________________________________________________
DATE INSTALLED: ___________________________________________________________________
DEALER: ___________________________________________________________________________
ADDRESS: __________________________________________________________________________
TELEPHONE: _______________________________________________________________________
In most cities and counties, permits will be required for the installation of electrical circuits or the construction of
exterior surfaces (decks and gazebos). In addition, some communities have adopted residential barrier codes which
may require fencing and/or self-closing gates on the property to prevent unsupervised access to a pool (or spa) by
children under 5 years of age. Your Hot Spring spa is equipped with a locking cover that meets the ASTM F1346-91
Standard for Safety Covers and as a result, is usually exempt from most barrier requirements. As a general practice,
your local Building Department will inform you of any applicable barrier requirements at the time a permit is obtained
for the installation of an electrical circuit. Your Hot Spring dealer can provide information on which permits may be
required.
Congratulations on your decision to
enjoy the finest spa available...
Welcome to the growing family of
Hot Spring spa owners.
Hot Spring Spa Pre-Delivery Instructions
Collection
®
Register your warranty
using the QR code below:

Advertisement

Table of Contents
loading

Summary of Contents for HotSpring PULSE

  • Page 1 Limelight Collection ® Congratulations on your decision to enjoy the finest spa available... Welcome to the growing family of Hot Spring spa owners. Pre-Delivery Instructions Please take the time to read this booklet carefully, as it will provide you with the information you will need to ensure the safe, secure, and timely installation of your new spa.
  • Page 2: Site Selection And Preparation

    Site Selection and Preparation IMPORTANT: Site selection and preparation are your responsibility. Carefully read these instructions and consult ® your authorized Hot Spring dealer if you have any questions. You probably have a spot picked out for your new spa, whether it’s indoors or outdoors, on a patio or on a deck. Just make sure you check the following: • Always put your spa on a structurally sound, level surface. A filled spa can weigh a great deal. Make certain that the location you choose can support the weight of your filled spa.
  • Page 3 NOTE: If your spa delivery requires the use of a crane, you may be required to pay for its services at the completion of the delivery. Model Width W Length L Height H ™ Gleam (GLM) 38" 110" 91" Pulse ® (PLS) 38" 89" 89" Flair ® (FLR) 36" 84" 84"...
  • Page 4: Ground Preparation

    *NOTE: A reinforced concrete pad at least four inches thick or a deck that is able to withstand more than 125lbs. per square foot is recommended for the Gleam ™ , 115lbs. per square foot is recommended for the Pulse ® spa, 110lbs.
  • Page 5 GLEAM (Model GLM) ™ GLEAM Dimensions NOTE: All dimensions are approximate; measure your spa before making critical design or pathway decisions. (Front view) Door Door Door 95” ( 241.3 cm) Drain 20” (50.8 cm) Electrical Cutout 1.5" (4.4 cm) 49.5” (125.7 cm) 110"...
  • Page 6 89" (226cm) of Spa NOTE: Watkins Manufacturing Corporation recommends that the Pulse be installed on a minimum 4” (10 cm) thick reinforced concrete pad or structurally sound deck able to support the “dead weight” found in the spa specification chart.
  • Page 7 FLAIR (Model FLR) ® Dimensions FLAIR NOTE: All dimensions are approximate; measure your spa before making critical design or pathway decisions. (Front view) Door Door Door 69.5” (176.5 cm) Drain 19” (48.3 cm) Electrical Cutout 1.5" (4.4 cm) 31” (78.7 cm) 84”...
  • Page 8 GLOW (Model GLW) ® Dimensions Glow NOTE: All dimensions are approximate; measure your spa before making critical design or pathway decisions. Door Door Door (Front view) 61.5” (156.2 cm) Drain 19” (48.3 cm) Electrical Cutout 1.5" (4.4 cm) 33” (83.8 cm) 76"...
  • Page 9 BOLT (Model BLT) ® Dimensions BOLT NOTE: All dimensions are approximate; measure your spa before making critical design or pathway decisions. (Front view) Door Door Door 65” (165.1 cm) Drain 18.5” (47 cm) Electrical Cutout 1.5" (4.4 cm) 34” (86.4 cm ) 80”...
  • Page 10: Electrical Requirements

    IMPORTANT NOTE: Three different wiring diagrams are shown: one Gleam, Pulse, Flair and Glow models 50 amp, one Gleam 70 amp and one for a Bolt 50 amp model. Always follow the wiring diagram for your specific model.
  • Page 11 GLEAM (CONVERTED-OPTIONAL) IMPORTANT: If you ever need to move or relocate your Hot Spring spa, it is essential that you understand and apply these installation requirements. Your Hot Spring spa has been carefully engineered to provide maximum safety against electric shock. Remember, connecting the spa to an improperly wired circuit will negate many of its safety features.
  • Page 12: 115 Volt Gfci

    Bolt (Model BLT) ™ 230 volt converted model IMPORTANT! The exact physical location of the terminals on the GFCI breaker will vary between manufacturers. Connecting the hot wire to the neutral terminal will cause irreversible damage to the control box. See owner’s manual or control box schematic for...
  • Page 13: Installation Instructions

    garage circuits, etc.). If the spa is connected to a non-dedicated circuit, overloading will result in “nuisance tripping” at the main panel. This requires frequent resetting of the breaker switch at the house electrical breaker panel and introduces the possibility of damage or failure of spa equipment. The dedicated circuit must be properly wired; that is, it must have a 20-amp GFCI circuit breaker in the house breaker panel, #12 AWG or larger wire (including the ground wire) and the correct polarity throughout the circuit.
  • Page 14: Spa Specifications

    4,000 Square Adults single phase 97cm Feet 2.082 3,292 square 2.79m GFCI protected liters foot circuit 2.31m Pulse 7'5" 230 v System, ® 5,384 (Model PLS) 230 volt, 50 38" gallons lbs. lbs. lbs. Seats 7 7'5" amp single 4,000...
  • Page 15 CONTRACTOR SUGGESTIONS Electrician Name: _____________________________________________________________________________ Telephone: _____________________________________________________________________________ Name: _____________________________________________________________________________ Telephone: _____________________________________________________________________________ Masonry Name: _____________________________________________________________________________ Telephone: _____________________________________________________________________________ Name: _____________________________________________________________________________ Telephone: _____________________________________________________________________________ General Name: _____________________________________________________________________________ Telephone: _____________________________________________________________________________ Name: _____________________________________________________________________________ Telephone: _____________________________________________________________________________ SERVICES AVAILABLE FROM YOUR HOT SPRING ® DEALER Service Cost Pre-Delivery site inspection _____________ Deliver spa to installation site _____________...
  • Page 16 Explain the safety features • GFCI • Heater high limit • Heater thermal cut-off Service Cost General spa operation & maintenance orientation _____________ Water quality and maintenance orientation _____________ Adjust the water’s Total Alkalinity, Calcium Hardness and pH _____________ Sanitize the water _____________ Inspect the spa cover, place on spa _____________...
  • Page 20 Vista, California 92081 (800) 999-4688 extension 8432 ©2015 Watkins Manufacturing Corporation. Limelight, Hot Spring, Gleam, Pulse, Flair, Bolt, Glow, IQ 2020, CoverCradle, UpRite, ACE, Vanishing Act, Clean Screen, Lift’n Glide, EverFresh, FreshWater, and The Home Relaxation Specialists are trademarks of Watkins Manufacturing Corporation.

This manual is also suitable for:

GleamFlairGlowBolt

Table of Contents