8. Loosen the screws at the bottom of each vertical rail one turn—do not
remove the screws. Each rail is secured by two screws. (See Figure 67.)
Frame Cable
Vertical Rail
Rail Cable
Vertical Rail
Screw (2)
Screw (2)
Figure 67. Stacker Rail and Frame Cables
Power Stacker
385