5.7

FINISHING COMMISSIONING

The boiler has been factory set, so there should be no
need to adjust combustion settings.
REPLACE OUTER CASING:
1. Replace outer casing making sure that the securing points are
properly located.
▶ Press the clip (A) downwards to secure casing on top.
▶ Retighten bottom two screws (B).
A
Fig. 57 Fitting outer case
INSTALLING BOTTOM PANEL:
2. The bottom panel slides onto two ledges (C) either side of the boiler
frame.
▶ Hold the panel up against the underside of the boiler and slide
towards the rear until it is fully engaged.
HANDOVER:
▶ Complete the Benchmark check list.
▶ The fascia cover is opened by pulling the flap (D) towards you.
▶ Set up the controls and show the user how to operate all the controls
shown in the User Guide.
▶ If the appliance is unused and exposed to freezing conditions; shut
off all the mains supplies and drain the system and boiler.
6 720 815 725 (2015/05)
B
B
6720647361-25.4Wo
D
Fig. 58 Fitting bottom panel
COMMISSIONING
C
6720647361-26.3Wo
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

34cdi classic42cdi classic38cdi classic

Table of Contents