Installation; Unpacking Wall Frame And Ancillary Items - Worcester 29CDi Classic Installation, Commissioning And Servicing Instructions

Greenstar cdi classic erp wall hung rsf gas fired condensing combination boiler
Hide thumbs Also See for 29CDi Classic:
Table of Contents

Advertisement

INSTALLATION

4
INSTALLATION
WARNING: All the previous Pre-Installation sections
must be read and requirements met before starting
boiler or flue installation.
4.1

UNPACKING WALL FRAME AND ANCILLARY ITEMS

LIFTING AND CARRYING PRECAUTIONS:
WARNING:
▶ Lift only a manageable weight, or ask for help.
▶ When lifting the boiler, bend the knees, and keep the
back straight and feet apart.
▶ Do not lift and twist at the same time.
▶ Lift and carry the boiler close to the body.
▶ Wear protective clothing and gloves to protect from
any sharp edges.
IMPORTANT HANDLING INSTRUCTIONS
• It is advised that two people are used to carry the carton from the van
to the point of delivery.
• Once the carton has been delivered, the top of the carton is opened.
If a sharp implement is used make sure the carton is not pierced and
that the implement is used in such a way so that it may not cause
personal injury. All sharp objects must be covered or the blade
retracted after use and put away in a safe place.
1. The upper support is now removed with the components (bottom
panel, pre-plumbing manifold, fixings, documentation set, charging
link, hanging bracket).
2. The boiler wall mounting plate can now be pulled out.
Additional requirements for roof space installation:
• The boiler should be first unpacked before ascending ladder to loft
space.
• Two sets of steps should be used.
• Two people should share the lifting of the boiler up to the loft hatch,
where the boiler is entered into the loft space tilted and slid on its
back into the loft.
Once the appliance is removed from its packaging check the contents
against the packing list.
NOTICE: Before installing appliance ensure system
has been cleaned as explained on page 10.
22
1.
C
F
H
Fig. 25
A - Carton
B - Wall mounting plate with hanging bracket
C - Pre-plumbing manifold
D - Hardware pack
E - Literature pack
F - Bottom panel
G - Upper support (polystyrene)
H - ErP energy label
2.
B
G
A
D
E
6 720 815 725-01.1O
6 720 815 725 (2015/05)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

34cdi classic42cdi classic38cdi classic

Table of Contents