FINISHING COMMISSIONING

The boiler has been factory set, so there
should be no need to adjust any controls.
1 Install bottom panel.
A The cut out in the bottom panel fits easily
over the syphon elbow and outlet, however
care should be taken not to disturb any
sealed components.
B Hook the lip at the back of the bottom panel
over the angled edge at the base of the
connections manifold.
C Gently push up into position.
Clip into place over the two lugs.
2 Replace outer casing.
Replace outer casing making sure that the
securing points are properly located.
Replace top two screws (D).
Re-tighten bottom two screws (E).
HANDOVER:
Complete the Benchmark Gas Boiler
Commissioning Checklist.
NOTE: The Benchmark Checklist can be
found at the rear of these
instructions.
Set up the controls and show the user
how to operate all the controls shown
in the User Guide.
If the appliance is unused and exposed
to freezing conditions; shut off all the
mains supplies and drain the system
and boiler.
FINISHING COMMISSIONING