Condensate Connection - Worcester 29CDi Classic Installation, Commissioning And Servicing Instructions

Greenstar cdi classic erp wall hung rsf gas fired condensing combination boiler
Hide thumbs Also See for 29CDi Classic:
Table of Contents

Advertisement

INSTALLATION
1
3
Fig. 40 Plume distance to opening
1
Opening in building
2
Flue discharge
3
Plume deflector
4
Minimum 1500mm from an opening in the building
28
4
2
6720643895-119.1Wo
4.6

CONDENSATE CONNECTION

Never terminate or discharge into any open source, including; sink,
bath, shower, bidet, toilet etc.
Any external condensate pipe work of excessive runs
should be protected with weather resistant insulation to
help prevent freezing.
▶ Ensure that the condensate drain is 22mm diameter plastic pipe. It
must fall at least 52mm per metre towards the outlet.
▶ Refer to figure 41, condensate connection:
▶ Align the installation side plastic pipework through the pre-plumbing
manifold.
▶ Connect the installation side plastic pipework to the end of the
condensate hose.
▶ Push the plastic pipework inside the condensate hose at least
25mm.
Fig. 41 Condensate connection
6 720 815 725-10.1O
6 720 815 725 (2015/05)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

34cdi classic42cdi classic38cdi classic

Table of Contents