Finishing Commissioning; Replace Outer Casing; Fitting Fascia Flap; Installing Bottom Panel - Worcester 41-311-67 Installation, Commissioning And Servicing Instructions

Wall hung rsf gas fired condensing boiler
Table of Contents

Advertisement

COMMISSIONING
5.6

FINISHING COMMISSIONING

5.6.1

REPLACE OUTER CASING:

B Replace outer casing making sure that the securing
points are properly located.
B Replace top two screws (1).
B Tighten bottom two screws (2).
1.
1.
2.
Fig. 64 Fitting case
5.6.2

FITTING FASCIA FLAP

B Present the flap up to the appliance with the hinge
pins facing the appliance.
B Engage the left hand pin into the grey pivot. The hinge
pin and pivot hole are both square, rotate the flap to
ensure that the pin is located in the pivot.
B Support the flap in your left hand and with your right
hand, bend the right side down. This should enable
you to engage the right hand pin in the pivot. Rotate
the flap to ensure that the pins and pivots are located
securely.
B Close the flap.
42
5.6.3

INSTALLING BOTTOM PANEL

B The bottom panel slides onto two ledges (C) either
side of the boiler frame.
B Hold the panel up against the underside of the boiler
and slide towards the rear, until there is no more
movement.
B Slide the panel forward until it is fully engaged.
Fig. 65 Bottom panel installation
NOTICE: Every time the power to the
appliance is turned off and on, the
2.
appliance enters a learning mode and may
take some time to optimise the boiler
performance. This time is variable and is
dependant on hot water and central heating
demand.
5.6.4

HANDOVER

B Complete the Benchmark Gas Boiler Commissioning
Checklist.
The Benchmark Checklist can be found at
the rear of these instructions.
B Open the fascia cover by gently pressing the centre
top of the cover.
B Set up the controls and show the user how to operate
all the controls shown in the User Guide.
B Ensure that the user guide is left with the boiler or
homeowner.
B If the appliance is unused and exposed to freezing
conditions, shut off all the mains supplies and drain
the system and boiler.
6 720 644 743a (2010/10)
6720644743-23.1Wo

Advertisement

Table of Contents
loading

Table of Contents