Hardware Changes; General Hardware Installation Sequence - HP t610 Series Troubleshooting Manual

Flexible thin clients
Hide thumbs Also See for t610 Series:
Table of Contents

Advertisement

2

Hardware changes

General hardware installation sequence

To ensure the proper installation thin client hardware components:
1.
Back up any data, if necessary.
2.
If the thin client is powered on:
a.
Turn the unit and any other attached devices off.
b.
Disconnect the power cord from the wall outlet.
c.
Disconnect any external devices or cables, such as a cable lock.
WARNING!
sure to disconnect the power cord from the wall outlet and allow the internal system components
to cool before touching.
WARNING!
plug telecommunications or telephone connectors into the network interface controller (NIC)
receptacles.
CAUTION:
optional equipment. Before beginning these procedures, ensure that you are discharged of static
electricity by briefly touching a grounded metal object. See
for more information.
3.
Remove the stand, if it is installed. See
4.
Remove the side access panel and metal side cover, if necessary. See
the side access panel and metal side cover on page 11
5.
Remove any hardware that you will replace.
6.
Install or replace equipment. For removal and replacement procedures, see the following
sections:
Removing and replacing the battery on page 15
Installing a SODIMM on page 16
Installing a flash memory module on page 19
Replacing an internal hard drive on page 21
Installing a PCI-Express card on page 24
To reduce the risk of personal injury from electrical shock and/or hot surfaces, be
To reduce the risk of electrical shock, fire, or damage to the equipment, do not
Static electricity can damage the electronic components of the thin client or
Electrostatic discharge on page 68
Removing the stand on page 7
for more information.
General hardware installation sequence
for more information.
Removing and replacing
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents