Minimum Alcove Clearance To Combustible Materials; Additional Clearances For Backwall Exit - HAMPTON BAY H300 Owners & Installation Manual

Freestanding
Table of Contents

Advertisement

INSTALLATION
MINIMUM ALCOVE CLEARANCE TO
COMBUSTIBLE MATERIALS
This Hampton Freestanding model has been alcove approved and must be installed
with a listed double wall connector to the ceiling level.
Note: Minimum alcove ceiling height (from finished floor) - 60" (1525 mm)
Maximum depth of alcove - 48" (1220 mm)
Unit (with Heat Shield)
H300
Minimum Clearance to Combustibles
Unit (with Heat Shield)
H300
Min. Mantel Height (from finished floor):
Max. Mantel Depth:
Minimum Clearance to Non-Combustibles
Unit (with Heat Shield)
H300
10
From
Unit
G
H
15" (381 mm)
13" (330 mm)
ADDITIONAL CLEARANCES
FOR BACKWALL EXIT
From
Unit
A
B
9" (228 mm)
15" (381 mm)
48"
1219 mm
12"
305 mm
From
Unit
A
B
min. 0" (0 mm)
15" (381mm)
max. 9" (228 mm)
From Flue
Center-line
I
J
28" (711 mm)
13" (330 mm)
Note: Floor Protection must extend 2" (50mm)
to each side of the elbow.
Note: If side load door is used, floor protection
must extend at least 18" (457mm) from
the side of the unit.
Hampton H300 Cast Freestanding Woodstove
Min.
Min.Hearth
Width
to Rear Wall
K
L
57" (1448 mm)
51-1/4"
(1301 mm)
without side load door
60" (1524 mm)
with side load door

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents