Daikin FTKS20CVMB Service Manual page 172

Inverter pair wall mounted type
Hide thumbs Also See for FTKS20CVMB:
Table of Contents

Advertisement

SiENBE04-401A
Step
4
Disengage the hooks of
the pipe retainer on the
back.
5
Pull auxiliary pipe
forward to an angle of
10 to 20 degrees.
6
Disengage hooks
located right and left
side, and pull heat
exchanger forward.
The hooks are
symmetrically placed in
the right and the left.
Removal Procedure
Procedure
This hook is located borh side of heat exchanger.
Press this hook to remove heat exchanger easily.
Points
Pipe retainer
Be careful to prevent pipe
deformation.
Lifting the heat-exchanger
slightly upward to the right,
the left hook comes to be
disengaged easily.
Indoor Unit
(R2547)
163

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents