Daikin FTKS20CVMB Service Manual page 168

Inverter pair wall mounted type
Hide thumbs Also See for FTKS20CVMB:
Table of Contents

Advertisement

SiENBE04-401A
Step
2. Removal of PCB
1
Remove the shelter.
Disengage the front
2
plate of the electrical
box.
Disengage the knobs
by pushing the two
hooks at the top and the
bottom.
3
Sliding to the left, the
front part of the
electrical box can be
removed.
Removal Procedure
Procedure
Pushing point
Shelter
Pushing point
Indoor Unit
Points
(R2535)
Push
(R2536)
159

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents