Vent Installation - FireplaceXtrordinair 44 DV XXL Owner's Manual

Hide thumbs Also See for 44 DV XXL:
Table of Contents

Advertisement

Installation
1 8

Vent Installation

¥
In addition to the requirements below, follow the requirements provided with the vent.
Vertical Vent
Requirements
Use the Simpson ceiling firestop (#1263) whenever
passing through a ceiling (or enclosure and at every
floor penetration.
Horizontal Vent
Requirements
Minimum
10" wide
¥
Apply high-temperature silicone to the inner and outer pipe before assembling the sections (on the
male, upper section). This seals the inner pipe from the outer pipe. Slide the sections together and
turn 1/4 turn until the sections lock in place. Install three metal screws through each joint to lock the
outer section in place (see the instructions included with the vent for further details).
Horizontal sections require a 1/4" rise every 12" of travel
Horizontal sections require non-combustible support every three feet (e.g.: plumbing tape)
Travis Industries
Use a roof flashing and storm collar
whenever passing through the roof
10"
by
10"
Minimum framing
for fire stop
Minimum framing
for fire stop
Minimum
12" tall
(for qualified installers only)
Use the Travis firestop (part # 93006094) when passing
through a wall. NOTE: make sure the firestop is postitioned
correctly so the 3" clearance is allowed above the vent.
1" Min.
Apply a 1/8" (3 mm)
bead of high-
temperature silicone
to the inner and
outer pipe. The
silicone must seal
the inner pipe from
the outer pipe.
9 3 5 0 8 1 0 9
Vertical Termination
(part # 1291)
Combustible
Framing
Min. 1" Clearance on
Horizontal Sections to
combustible surfaces.
Combustible
Surfaces
3" Min.
1" Min.
1 8 0 5 0 1