wsm RTV900 Workshop Manual page 108

Hide thumbs Also See for RTV900:
Table of Contents

Advertisement

RTV900, WSM
Nozzle Holder Assembly and Glow Plug
1. Remove the overflow pipe (2).
2. Remove the nozzle holder assemblies (4).
3. Remove the copper gasket (5) and the heat seal (6).
4. Remove the lead (3) from the glow plugs (1).
5. Remove the glow plugs (1).
(When reassembling)
• Replace the copper gasket and heat seal with new one.
Overflow pipe retaining nut
Tightening torque
Nozzle holder assembly
Glow plug
(1) Glow Plug
(2) Overflow Pipe
(3) Lead
Rocker Arm and Push Rod
1. Remove the rocker arm bracket screws (1).
2. Detach the rocker arm assembly (2).
3. Remove the push rods (3).
(When reassembling)
• When putting the push rods (3) onto the tappets (4), check to see
if their ends are properly engaged with the grooves.
IMPORTANT
• After installing the rocker arm, be sure to adjust the valve
clearance.
Tightening torque
Rocker arm bracket screw
(1) Rocker Arm Bracket screws
(2) Rocker Arm Assembly
1-S22
ENGINE
19.6 to 24.5 N·m
2.0 to 2.5 kgf·m
14.5 to 18.1 lbf·ft
49.0 to 68.6 N·m
5.0 to 7.0 kgf·m
36.2 to 50.6 lbf·ft
7.85 to 14.7 N·m
0.8 to 1.5 kgf·m
5.8 to 10.8 lbf·ft
(4) Nozzle Holder Assembly
(5) Copper Gasket
(6) Heat Seal
W1025798
9.8 to 11.3 N·m
1.00 to 1.15 kgf·m
7.2 to 8.3 lbf·ft
(3) Push Rod
(4) Tappet
W1026181
KiSC issued 03, 2008 A

Advertisement

Table of Contents
loading

Table of Contents