* Wired by a qualified electrician * Operated only for its designed purposes * Used only by operators who understand its operation Congratulations on your choice of a Winco generator set. You * Properly maintained have selected a high-quality, precision-engineered generator...
Keep fuel containers out of reach of children. SAFETY INFORMATION Do not smoke or use open flame near the This engine generator set has been designed and generator set or fuel tank. manufactured to allow safe, reliable performance. Keep a fire extinguisher nearby and know its Poor maintenance, improper or careless use can result proper use.
0 f(-18 c) -20 f(-29 c) Additional optional A.T.S. sizes are available to meet PSS15B2W 150 Gal. 250 Gal. 500 Gal. 1000 Gal. specific needs. Contact your local WINCO dealer, or the WINCO Sales Department for a quote. 60706-186 PAGE 2 7340-20...
**** CAUTION **** ENGINE SPECIFICATIONS: These units are shipped with oil. Be sure to check oil Refer to engine operating and maintenance instructions. levels before operating. See engine manufacturer’s ** NOTICE ** instruction manual for recommended oil requirements before initial starting. Regarding Engines - This manual covers the generator portion of these units.
The unit’s main frame should be bolted solid to a four to ************* six inch thick cement pad. The engine-generator is ***** WARNING **** mounted on a sub-frame which is isolated with special ************* shock mounts on the main frame. This allows the engine- FIRE HAZARD - DO NOT OVERTIGHTEN THE FUEL generator to vibrate without affecting the control panel on LINE.
Fuel Pressure Table Size of pipe normally required for generators operating on NATURAL GAS or LP VAPOR Single Regulator (L.P. Vapor only) up to 25 feet* 25 - 100 feet* over 100 feet* use a two UNIT OFF TANK PSI 7-11 in 7-11 in PSS15B2W 3/4”...
When moving the fuel line from one port to the other be 3. Check both the battery cable ends and the battery sure not to kink or bend the line. Use as large a sweeping posts to be sure they are free of corrosion. curve as possible and never shorten the fuel line.
*****CAUTION***** MOUNTING THE AUTOMATIC EQUIPMENT DAMAGE - Always connect the positive TRANSFER SWITCH (A.T.S.) cable first and the negative cable last, when disconnect- ************* ing, it is negative cable first and positive last. Failure to ***** WARNING ***** connect and disconnect in the proper sequence can ************* cause equipment damage.
Page 11
When properly installed, the normal A.T.S. control and safety systems will WINCO UL ATS (ASCO165) & (ASCO 300) eliminate all paths for feedback. Check with your local electrical inspector on applicable local, state and federal See the ASCO installation manual for additional codes.
If only specific circuits are to be powered under emer- INITIAL START UP gency power failure conditions, an additional distribution panel designated “emergency distribution panel” must be ************* installed. ***** WARNING ***** All selected emergency circuits are removed from main ************* distribution panels and reinstalled in the emergency DO NOT jump start these engine generator sets.
Page 13
Transfer Switch & Engine Generator and stay on a malfunction has occurred. Either the unit didn’t start or the voltage or frequency is incorrect. Correct the problem before continuing. This procedure checks the electrical operation of the automatic transfer switch. If the actual operation does not 5.
************* ENGINE CRANKS BUT WILL NOT START. ***** WARNING ***** Improper fuel pressure being delivered to unit. ************* Fuel supply shut off. WITH A TOTAL POWER FAILURE (UTILITY POWER Fuel tank empty. FAILS AND THE GENERATOR FAILS TO START AND Defective spark plug.
ENGINE GENERATOR SET PREVENTIVE MAINTENANCE Service the engine in accordance with the engine manufacturers manual provided with your new equip- ment. Routinely remove debris and dirt from around and Reasonable care in preventive maintenance will insure inside generator enclosure. Insure that the air intakes are high reliability and a long life for the engine generator set free from leaves and other debris at all times.
WINCO UL ATS Complete installation instructions for WINCO UL Automatic Transfer Switches are contained in the operator manual with each switch. Read the complete instructions before installing. CUSTOMER DC CONNECTION POINT All control wires (18-12 AWG) must be torqued to 19 in-lbs.
WINCO’s sole liability, and Purchaser’s sole remedy for a failure under this warranty, shall be limited to the repair of the product. At WINCO’s option, material found to be defective in material or workmanship under normal use and service will be repaired or replaced.