EAS23710
ENGINE REMOVAL
Removing the exhaust pipe assembly
17 Nm (1.7 m
25 Nm (2.5 m
4
20 Nm (2.0 m
kg, 14 ft
•
12 Nm (1.2 m
•
Order
Left side cowling/Right side cowling/T-bar
Fuel tank
Coolant
Radiator
1
O
sensor coupler
2
O
sensor
2
2
3
Left muffler
4
Right muffler
5
Exhaust pipe assembly
6
Gasket
kg, 12 ft
Ib)
•
•
kg, 18 ft
Ib)
•
•
Ib)
•
kg, 8.7 ft
Ib)
•
45 Nm (4.5 m
Job/Parts to remove
1
2
kg, 32 ft
Ib)
•
•
Q'ty
Refer to "GENERAL CHASSIS" on page
4-1.
Refer to "FUEL TANK" on page 7-1.
Drain.
Refer to "CHANGING THE COOLANT" on
page 3-19.
Refer to "RADIATOR" on page 6-1.
1
Disconnect.
1
1
1
1
4
For installation, reverse the removal proce-
dure.
5-1
ENGINE REMOVAL
3
New
6
5
(8)
20 Nm (2.0 m
kg, 14 ft
•
Remarks
Ib)
•