KERN FTB Service Manual page 71

Compact scales platform balances and terminals
Table of Contents

Advertisement

8.6.2
Preparing the connecting cable for the weighing platform
15 mm
8.6.3
Attaching the weighing platform to the terminal
72
135 mm
5 mm
Remove the insulation as shown on the left.
Note: For connecting to the analog option, only 100 mm
of cable insulation should be removed.
Before assembling, the terminal must first be discon-
nected from the power supply!
Undo the gland nut of the heavy gauge cable gland and
remove this together with the black crimping ferrule and the
two washers.
Undo the rear cover plate of the terminal (6 Torx T20
screws) and fold down carefully (cable connections!).
Mount the nut, crimping ferrule and the washer with the
larger hole on the connecting cable of the weighing
platform. Flange the shield of the cable slightly and place
the second washer over it. Insert the cable through the
heavy gauge cable gland of the terminal.
Remove the green plug from the terminal. The plug
connector is fitted with a latch to simplify plugging in and
out. The diagram opposite shows the position of the
connector in the terminal.
FTx/ITx-SH-e-0720

Advertisement

Table of Contents
loading

This manual is also suitable for:

ItbFtcIttKmbKmsKmt-tm ... Show all

Table of Contents