•
Remove front panel, unscrew and
remove the two retaining screws from
the bottom of the front panel. Remove
front panel by lifting up and forward.
•
To remove the self adhesive wiring
diagram label from the document
envelope, fit the self adhesive wiring
diagram label to the inside of the front
panel, put front panel in a safe place to
avoid damaging it.
•
The hanging bracket will be adapted to
the features of the bearing wall and will
have to take into account the weight of
the boiler filled with water.
•
Drill the holes for the fixing screws
in accordance to the diagram below
and to the size of the wall template
delivered with the appliance.
45
250
165
Ø105
104.5
•
Screws mechanical features will match,
at least, the values indicated on the
following sketch.
85
45
50
min.
19
n .
n .
m i
m i
k g
k g
1 5
1 5
n .
n .
m i
m i
k g
k g
1 5
1 5
n .
n .
m i
m i
k g
k g
m i
m i
1 5
1 5
k g
k g
1 5
1 5
1 5
1 5
•
Place the boiler above the hanging
bracket.
•
Slowly lower the boiler.
•
Set the seals on the different pipe
fittings.
•
Make connections to boiler, gas,
water and heating cocks with the tube
assemblies supplied in piping pack.
•
Do not forget to connect
the filling loop extension
on the filling tap.
n .
n .
n .
n .
m i
m i
n .
n .
m i
m i
k g
k g
k g
k g
1 5
1 5