Saunier Duval ISOTWIN CONDENS F 35 E Instructions For Use, Installation & Servicing page 22

High efficiency condensing combination boiler
Table of Contents

Advertisement

Remove front panel, unscrew and
remove the two retaining screws from
the bottom of the front panel. Remove
front panel by lifting up and forward.
To remove the self adhesive wiring
diagram label from the document
envelope, fit the self adhesive wiring
diagram label to the inside of the front
panel, put front panel in a safe place to
avoid damaging it.
The hanging bracket will be adapted to
the features of the bearing wall and will
have to take into account the weight of
the boiler filled with water.
Drill the holes for the fixing screws
in accordance to the diagram below
and to the size of the wall template
delivered with the appliance.
45
250
165
Ø105
104.5
Screws mechanical features will match,
at least, the values indicated on the
following sketch.
85
45
50
min.
19
n .
n .
m i
m i
k g
k g
1 5
1 5
n .
n .
m i
m i
k g
k g
1 5
1 5
n .
n .
m i
m i
k g
k g
m i
m i
1 5
1 5
k g
k g
1 5
1 5
1 5
1 5
Place the boiler above the hanging
bracket.
Slowly lower the boiler.
Set the seals on the different pipe
fittings.
Make connections to boiler, gas,
water and heating cocks with the tube
assemblies supplied in piping pack.
Do not forget to connect
the filling loop extension
on the filling tap.
n .
n .
n .
n .
m i
m i
n .
n .
m i
m i
k g
k g
k g
k g
1 5
1 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents