Verify status LEDs

Figure 29 Power cable clips for the 2U 25-disk DAE
Figure 30 Power cable clips for the 2U 12-disk DAE
6. Dress the cables as necessary.
It takes approximately 10-15 minutes for the system to power up. Monitor the system
as it powers up. The LEDs show the progress of system activation. Green, blue, and
amber activity lights blink during the startup sequence. Review the next section for
information on the power up states.
Note
For information about powering down the system, see "Shut down the system" in the
Unisphere online help system.
The system should be available in approximately 15 minutes.
Figure 32 on page
37, and
to verify to ensure that the system powered up correctly.
CL4591
Figure 33 on page 37
call out only the LEDs that you need
Rack and install
Table 4 on page
36,
Verify status LEDs
35