IDEAL Logic+ Combi 24 Installation And Servicing page 12

Hide thumbs Also See for Logic+ Combi 24:
Table of Contents

Advertisement

BOILER DIMENSIONS, SERVICES & CLEARANCES
1
The boiler connections are made on the boiler connection tails.
Refer to Frame 24.
The following minimum clearances must be maintained for
operation and servicing.
Additional space will be required for installation, depending upon
site conditions.
Side and Rear Flue
a. Provided that the flue hole is cut accurately, e.g. with a core
drill, the flue can be installed from inside the building where
wall thicknesses do not exceed 600mm (24"). Where the
2.5
43.5
12
general
2.5
from case
Side flue
dim. A
Centre line
of boiler
65
28.5 28.5 60.6
75
56.4
37.5
all dimensions in mm
space into which the boiler is going to be installed is less
than the length of flue required the flue must be fitted from
the outside.
Installation from inside ONLY
b. If a core boring tool is to be used inside the building the
space in which the boiler is to be installed must be at least
wide enough to accommodate the tool.
395
700
Underside View - Dimensions to Wall
front clearance
The minimum front clearance when built in to
a cupboard is 5mm from the cupboard door
but 450mm overall clearance is still required,
with the cupboard door open, to allow for
servicing.
*
bottom clearance
Bottom clearance after installation can be
reduced to 5mm.
This must be obtained with an easily
removable panel, to enable the consumer
to view the system pressure gauge, and
to provide the 100mm clearance required
for servicing.
+
Ideal Logic
Combi -
Installation and Servicing

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logic+ combi 35Logic+ combi 30

Table of Contents