If theoriginal s ystem used:
HCFC-22 r efrigerant, thenflushthesystem using the
procedure p rovided inthissection,
HFC-410A refrigerant, thenproceed to
Installing New
Refrigerant Metering Device.
INVERTED
HCFC-22
CYLINDER
/
CONTAINS
CLEAN
HCFC-22
TO
BE USED FOR FLUSHING.
GAUGE
!O_
U'!
MANIFOLD
LOW
HIGH
I
PRESSURE
PRESSURE
suc
t'_
SERVICE
VALVE _
_
I
: _'_
:I
'_J
/\/\
_=n _
_ i-g h,
/
\
_
i
I
u"
w _ ,_ 'U
OPENEDII II
CLOSED
RECOVERY
CYLINDER
RECOVERY
MACHINE
NOTE - THE INVERTED
HCFC-22
CYLINDER
MUST CONTAIN
AT LEAST THE SAME
AMOUNT
OF REFRIGERANT
AS WAS RECOVERED
FROM THE EXISTING
SYSTEM,
Figure 22. Typical Flushing Connection
REQUIRED
EQUIPMENT
Equipment required to flush the existing line set and indoor
unit coil:
Two clean HCFC-22 recovery bottles,
Oilless recovery machine with pump-down feature,
Two
gauge
sets
(one
for
HCFC-22;
one
for
HFC-410A).
FLUSHING
PROCEDURE
1. Connect the following:
HCFC-22 cylinder with clean refrigerant to the
suction service valve,
HCFC-22 gauge set to the liquid line valve,
Recovery machine with an empty recovery tank to
the gauge set,
2. Set the recovery machine for liquid recovery and start
the recovery machine. Open the gauge set valves to
allow the recovery machine to pull a vacuum on the
existing system line set and indoor unit coil.
3. Invert the cylinder of clean HCFC-22 and open its
valve to allow liquid refrigerant to flow into the system
through the suction line valve, Allow the refrigerant to
pass from the cylinder and through the line set and the
indoor unit coil before it enters the recovery machine.
4. After all of the liquid refrigerant has been recovered,
switch the recovery machine to suction recovery so
that all of the HCFC-22 suction is recovered. Allow the
recovery machine to pull a vacuum on the system,
5. Close the valve on the inverted HCFC-22 drum and
the gauge set valves. Pump the remaining refrigerant
out of the recovery machine and turn the machine off.
XP16 units use CTXV for metering refrigerant only. This
section
provides
instructions
on
installing
CTXV
refrigerant metering device.
1/2 TURN
Figure 23. Tightening
Distance
TYPICAL CTXV INSTALLATION
PROCEDURE
The CTXV unit can be installed internal or external to the
indoor coil. In applications where an uncased coil is being
installed in a field-provided plenum, install the CTXV in a
manner that will provide access for field servicing of the
CTXV, Refer to Figure 24 for reference during installation
of CTXV unit.
TWO PIECE
(Uncased
Coil Shown)
PATCH PLATE
UNCASED
COIL
ONLY)
LIQUID LINE
. .'_ORIFICE
STUB END
HOUSING
DISTRIBUTOR
CTXV
TUBES.
-
RING
SENSING
LINE
MALE EQUALIZER
LINE
FITTING
(SEE FIGURE 26
FOR FURTHER
DETAILS)
LINE
SENSING
BULB
INSULATION
IS
REQUIRED
IF MOUNTED
EXTERNAL
TO THE COIL CASING
SEE FIGURE 25
FOR BULB POSITIONING.
LIQUID
LINE
Figure 24. Typical CTXV Installation
1, Remove
the field-provided
fitting
that temporary
reconnected
the
liquid line to the
indoor
unit's
distributor assembly,
Page13
XP16 SERIES

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xp16 series

Table of Contents