Start-Up Checklists; Tools Required - Lennox Dave Signature XP21 Installation Instructions Manual

Hide thumbs Also See for Dave Lennox Signature XP21:
Table of Contents

Advertisement

Start-Up Checklists

Use this procedure to verify part‐ and full‐load capacity op­
eration of the two‐stage compressor.

TOOLS REQUIRED

S Refrigeration gauge set
S Digital volt/amp meter
S Electronic temperature thermometer
S On‐off toggle switch
PROCEDURE
1. Turn main power OFF to outdoor unit.
2. Adjust room thermostat set point 5ºF above (heating
operation) or 5ºF below (cooling operation) the room
temperature.
3. Remove control access panel. Install refrigeration
gauges on unit. Attach the amp meter to the common
(black wire) wire of the compressor harness. Attach
thermometer to discharge line as close as possible to
the compressor.
4. Turn toggle switch OFF. Install switch in series with Y2
out terminal on the outdoor control.
5. Cycle main power ON.
6. Allow pressures and temperatures to stabilize before
taking any reading (may take up to 10 minutes).
7. Record all of the readings for the Y1 demand.
8. Close switch to energize Y2 demand. Verify power is
going to compressor solenoid (see note ** in the Field
Operational Checklist).
9. Allow pressures and temperatures to stabilize before
taking any reading (may take up to 10 minutes).
10. Record all of the readings with the Y1 and Y2 demand.
11. If temperatures and pressures change in the direction
noted in chart, the compressor is properly modulating
from low to high capacity. (If no amperage, pressures
or temperature readings change when this test is per­
formed, the compressor is not switching between low
and high capacity and replacement is necessary.)
12. After testing is complete, return unit to original set up.
Page 24

Advertisement

Table of Contents
loading

Table of Contents