Operation - MK Diamond Products CX-3E1 Owner's Manual & Operating Instructions

Electric concrete saw
Table of Contents

Advertisement

CX-3E1
Standard Operation
The following is a brief overview of operating the CX-3E1.
(A)
Use the depth control wheel to
raise the blade clear of the floor.
(D)
Tighten thumbscrew.
(G)
Open Cooling Supply Valve. Ver-
ify proper cooling flow and adjust
the water flow on the Blade to a
desired amount.
(B)
Attach the cooling supply
hose to the Cooling Inlet.
(E)
Layout and mark the area to
be cut using a chalk-line. Align
Pointer and Blade to chalk-line.
(H)
Slowly lower the Blade until the
desired level is reached and
begin the cut.
19

OPERATION

(C)
Lower the Pointer. Align a straight-
edge with a blade. Loosen thumb-
screw on front of Pointer to adjust
guide wheel, align with straightedge.
(F)
Plug saw into electrical supply.
Start the CX-3E1
(J)
When the cut is complete, raise the
Blade. Close Cooling Supply Valve
and shut down saw.

Advertisement

Table of Contents
loading

Table of Contents