Sharp MX-2300 G Installation Manual page 25

Digital full color multifunctional system
Hide thumbs Also See for MX-2300 G:
Table of Contents

Advertisement

: Dec. 15 2005
1
[4] MX-RPX1
MX2700N
1. Unpacking
A. Removal of the RSPF
B. Check the packed items
1)
Check that all the items are included in the package.
1
1
No.
Names of bundles
1
SPF glass unit
2
Step screw R
3
SPF step screw R
4
Screw (M5 x 16)
2
3
4
Quantity
1
1
1
2
MX-2300/2700 N/G MX-RPX1 4 – 1
2. Installation
<Note before installation>
* Before installation, check to insure that the data lamp on the
operation panel does not blink or light up.
A. Turn off the power of the main unit.
1)
Turn OFF the power switch on the operation panel.
2)
Open the front cabinet.
Turn OFF the power switch in the front cabinet of the main unit.
3)
Disconnect the power plug of the main unit from the power out-
let, and remove the earth cord.
B. RSPF unit installation
1)
Lift and remove the OC cover from the machine.
OFF
OFF
OFF

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mx-2700 gMx-2300 nMx-2700 n

Table of Contents