Heat Exchanger Cleaning; Blower Removal - CAC / BDP CBMAAA Installation Instructions Manual

Multipoise oil furnace input capacities 70,000-154,000
Table of Contents

Advertisement

Available languages

Available languages

This furnace should never be operated without an air filter.
Disposable filters should be replaced at least once a year. If
equipped to provide cooling, filters should be replaced at a
minimum of twice a year.
To avoid personal
injury, make sure the power is "OFF"
before servicing.
ALWAYS
KEEP
THE
OIL
VALVE
CLOSED
IF THE
BURNER IS SHUT DOWN FOR AN EXTENDED
PERIOD
OF TIME.
For optimum performance,
the oil burner nozzle should be
replaced at least once a year.
The procedure
for the installation
and/or replacement
of a
nozzle is outlined in the oil burner instruction manual which
is supplied with the furnace.
After replacing the nozzle, the burner should be adjusted in
accordance with the "COMBUSTION
CHECK" section of this
manual.
4.1
HEAT EXCHANGER
CLEANING
Normally, it is not necessary to clean the heat exchanger or
flue pipe every year, but it is advisable to have a qualified
service
technician
check
the unit before
each
heating
season to determine
whether
cleaning or replacement
of
parts is required.
If cleaning is necessary, the following steps should be taken:
1.
Turn "OFF" all utilities
upstream
from the furnace;
2.
Disconnect
the flue pipe (only with chimney venting and
rigid flue pipe);
3.
Remove the breech plate;
4.
Remove the radiator baffle;
5.
Disconnect
the oil line and remove the oil burner from
the furnace;
6.
Open the two cIeanout doors located in the upper part
of the front panel of the furnace;
7.
Clean the secondary
tubes
and the primary cylinder
with a stiff brush and a vacuum cleaner;
8.
Before reassembty,
the heat exchanger and combustion
chamber
should
be
inspected
to
determine
if
replacement is required;
9.
After cleaning,
replace the radiator
baffle, flue collar
plate, oil burner and close the two clean out access
doors. Reconnect the flue pipe and oil line;
10. Readjust burner for proper operation.
4.2
BLOWER REMOVAL
To remove the blower from the furnace:
1.
Turn "OFF" all utilities
upstream
from the furnace;
2.
Remove the burner access door and blower door;
3.
Remove
the blower
retaining
screw
(on the blower
partition panel);
4.
Remove
the control
box cover
and
disconnect
the
thermostat and power wires from the board;
5.
Slide the blower on the rails toward the front of the unit;
6.
Reverse the above steps to reinstall the blower. Please
refer to the wiring diagrams,
Figures 12 and 13 in this
manual,
or the diagram
located on the inside of the
blower door to properly rewire the unit.
I Be sure that the blower is adequately
supported
when
sliding
it off the
mounting
rails,
especially
in the
horizontal or counter flow positions, in order to prevent
dropping
it and
injuring
yourself
or damaging
the
blower.
4.3
BLOCKED VENT SHUT OFF (BVSO) CLEANING
For continued
safe operation,
the Blocked Vent Shut-Off
System
(BVSO)
needs to be inspected
and
maintained
annually by a qualified service technician.
ELECTRICAL
SHOCK
HAZARD
Failure
to follow
this
warning
could
result
in
personal
injury
or death.
Disconnect
electrical
power
supply
to
the
furnace
before
servicing
the blocked
vent
shut-off.
1.
Remove
the
two
screws
holding
down
the
BVSO
assembly cover;
2.
Remove the cover;
3.
Remove the two screws holding the control box to the
heat transfer tube assembly. Sliding the control box in the
appropriate direction will unlock it form the heat transfer
tube assembly;
4.
Carefully remove any build-up from the thermal switch
surface;
Do not
dent or scratch
the surface
of the thermal
switch.
If the thermal switch
is damaged,
it must be
replaced.
5.
Clear and remove any build-up or obstruction inside the
heat transfer tube;
6.
Re-mount,
lock and fasten the control box with the 2
screws removed in step 3;
7.
Re-attach the assembly cover with the screws removed in
step 1;
8.
Re-establish power to the appliance.
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cmbaar

Table of Contents