INSTALLATION

Water Line

Purge the water line prior to final connection to the unit. This
will remove any debris that may be present in the tubing
from installing the new water line. Connect the plastic tubing
from the unit to the house water supply line with the fitting
connection kit provided. Check all water line fittings for
leaks. Refer to the illustration below.
Water lines can not be exposed to
IMPORTANT NOTE:
freezing temperatures.
PEX
TUBING
Water line.
|
10
Sub-Zero Customer Care 800.222.7820

Custom Panels

For integrated models, custom door panels and handle
hardware must be installed. Stainless steel panels are
available through an authorized Sub-Zero dealer. For local
dealer information, visit the find a showroom section of our
website, subzero.com.
The thickness of the custom panel can vary. A minimum
5
/
"
thick panel is required, but the thickness can be
(16)
8
increased provided it does not exceed the maximum panel
weight indicated in the chart below. The depth of each
integrated model is 24"
(610)
planning the finished opening depth.
PANEL REQUIREMENTS
COLUMN
27"
(686)
TALL (DOOR)
27"
(686)
36"
(914)
DRAWER
27"
(686)
36"
(914)
PANEL THICKNESS
All Panels
. Allow for panel thickness when
MAX WEIGHT
65 lbs
(29 kg)
MAX WEIGHT
40 lbs
(18 kg)
53 lbs
(24 kg)
MAX WEIGHT
12 lbs
(5 kg)
16 lbs
(7 kg)
MINIMUM
5
/
"
8
(16)

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IC-27R and is the answer not in the manual?

Questions and answers

Table of Contents