Integrated Refrigeration ......3 To ensure the safe and efficient installation of Sub-Zero equipment, please take note of the following types of Model Specifications .
Any questions or problems regarding the installation TOOLS AND MATERIALS REQUIRED should be directed to your authorized Sub-Zero dealer or • Appliance dolly able to support 500 lbs (227 kg) and Sub-Zero customer service at 800-222-7820. You may adequate manpower to handle the weight of the unit.
Site Preparation subzero.com/specs Opening Dimensions INTEGRATED MODELS IMPORTANT NOTE: The depth of each integrated model is 24" (610) from the front of the unit to its back. Your design may necessitate moving the unit back or cabinets forward to achieve TOP VIEW a flush fit.
Page 8
Site Preparation Electrical Requirements The electrical supply should be located within the shaded area shown in the illustrations below. Follow the National The outlet must be checked by a qualified electrician Electrical Code and local codes and ordinances when to be sure that it is wired with the correct polarity. Verify installing the receptacle.
Page 9
Do not use self-piercing valves. " (152) (38) A saddle valve kit is available from your authorized " (64) " (64) Sub-Zero dealer. " (343) An in-line filter is required when water conditions have 3" (76) " (38) a high sediment content.
Page 10
Site Preparation Anti-Tip Bracket Installation WOOD FLOOR APPLICATIONS Use the six #12 x 2 " wood screws and the six " flat To prevent the unit from tipping forward and provide washers provided. Drill pilot holes " (5) diameter a stable installation, the unit must be secured in place with the anti-tip bracket provided with the unit.
Page 11
Site Preparation subzero.com/specs Anti-Tip Bracket Installation Position the Unit INSTALL CONCRETE WEDGE ANCHORS: 1) Drill a " (10) diameter hole any depth exceeding the Before moving the integrated unit into position, secure minimum embedment. Clean the hole or continue the door closed, remove drawers and protect any finished flooring.
Integrated Installation Position the Unit Level the Unit If two integrated units are installed closer than 2" (51) to Level the integrated unit by turning the front leveling legs one another, refer to dual installations on page 20. clockwise to raise or counterclockwise to lower the unit. To assist you in adjusting the front leveling legs up or Plug the power cord into the electrical outlet.
Page 13
Integrated Installation subzero.com/specs Molding Installation Water Line Connection Install the decorative white molding strips to the top and QUICK CONNECT WATER VALVE sides of the integrated unit for a finished look. The top For units with an ice maker, the quick connect water valve molding strip, used on column and tall models, must be and PEX tubing are located on the bottom right side of the installed before the side molding can be attached.
Page 14
Check panel dimensions before proceeding. Additional IMPORTANT NOTE: The unit must be allowed to have panel information can be found in the Sub-Zero design ventilation through the fins of the kickplate/grille. You may guide and on our website, subzero.com.
Page 16
Integrated Installation Panel Considerations DOOR PANEL HEIGHT TOE KICK CLEARANCE The height of the door panel can extend beyond the The toe kick clearance can vary with the height of the typical panel height, provided you do not exceed the panel panel.
Page 17
Integrated Installation subzero.com/specs Panel Installation Before attaching the door panel to the door, place a screw DOOR PANEL INSTALLATION in the center of the upper and lower mounting positions, Remove the two pieces of mounting hardware attached to just enough that the slotted holes on the hinge side door the front of the door and set aside.
Page 18
Integrated Installation Panel Installation PANEL BRACKET POSITIONING The illustrations below show placement of panel mounting brackets. Dimensions are based on a 4" (102) toe kick and " (3) reveal. A reveal of up to " (6) is possible, but panel dimensions need to be adjusted accordingly. "...
Page 19
Integrated Installation subzero.com/specs Panel Installation With the two mounting brackets in place, install the DRAWER PANEL INSTALLATION drawer panel by engaging the top tabbed bracket first, Remove the mounting hardware provided and set aside. then slide the lower ’L’ bracket onto the positioning As with the door panel, you should work on the back side screws.
Page 20
Dual installation kits are available through your authorized standard screwdriver and rotate the cam in the center Sub-Zero dealer. portion of the hinge. You must make this adjustment to IMPORTANT NOTE: If a 27" (686) unit is installed next to a both the bottom and top hinge.
Page 21
Have stainless steel panels been inspected for any imperfections? This is to be done by the authorized Sub-Zero dealer or installer with the customer, upon completion of installation. Stainless steel panels are covered by a limited 60-day warranty for cosmetic...
If you are storing or disposing of your old refrigerator or service. freezer, please do it safely. Remove the For the name and number of Sub-Zero factory certified doors or tightly secure service nearest you, check the contact & support section the doors closed.
Need help?
Do you have a question about the 736TCILH and is the answer not in the manual?
Questions and answers