51 REPLACEMENT OF COMPONENTS

GENERAL
When replacing ANY component:
1. Isolate the electricity supply.
2. Turn off the gas supply.
3. Remove the boiler front panels and inner sealing panel.
Refer to Frames 44 and 45.
After replacing ANY component check operation of the boiler
including gas soundness, gas rate and combustion test.
THE BOILER MUST NOT BE OPERATED WITHOUT THE SEALING PANEL FITTED
52 FLOW THERMISTOR REPLACEMENT
1. Refer to Frame 51.
2. Remove the boiler front panels and inner
sealing panel. Refer to Frames 44 and 45.
Note. Only the boiler front panels need
removing on the HE15, 18 and 24 models)
3. Pull the electrical leads off the flow thermistor
and remove earth connection.
4. Remove the two screws retaining the flow
thermistor.
5. Replace flow thermistor retaining with the fixing
screws previously removed and reconnect
leads.
6. Reassemble the boiler in reverse order.
7. Check the operation of the boiler. Refer to
Frame 51.
mexico HE -
Installation & Servicing
SERVICING
3
mexico HE30 & HE36
IMPORTANT
When work is complete, the sealing panel must be
correctly fitted, ensuring that a good seal is made.
Note.
In order to assist fault finding, the control panel has an
LED diagnostic display. The key to boiler fault
conditions is shown in Frame 69.
mexico HE15, HE18 & HE24
4
4
3
35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

He24He18He30He36

Table of Contents