IDEAL HE15 Installation And Servicing page 3

Mexico he
Table of Contents

Advertisement

DOCUMENT AMENDMENTS
Relevant Installation changes implemented in this book from Mod Level ........... A02 (Apr 05) to A03 (May 05)
• Page 4, Table 2 - Performance Data
Sedbuk figures added.
• Page 16, Frame 13 - Fitting and Connecting Pre-piping Frame/Condensate Support Bracket
Note added to facilitate upward piping.
Item 2 - marking the flue hole added.
Item 4 - condensate pipe to be 20mm protruding from bracket clamp.
• Page 16, Frame 14 - Flue Hole Template
Item 2 - marking the flue hole added.
• Page 22, Frame 27 - Fitting the Optional Flue Finishing Kit and Optional RS Sealing Plate
Kit contents added and dimensions to RS sealing plate added.
• Page 23, Frame 28 - Connecting the Flue to the Boiler
Item 8 - ensuring positive flue seal to the boiler.
• Page 43, Frame 66 - Heat Exchanger Replacement
Item 25 - ensuring positive flue seal to the boiler.
• Page 49 - Short List of Parts
G.C. Part No's added.
Caradon Ideal Limited reserve the right to vary specification without notice
mexico HE -
Installation & Servicing
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

He24He18He30He36

Table of Contents