Servicing Schedule - IDEAL HE15 Installation And Servicing

Mexico he
Table of Contents

Advertisement

43 SERVICING SCHEDULE

To ensure the continued safe and efficient operation of the
appliance it is recommended that it is checked at regular intervals
and serviced as necessary. The frequency of servicing will depend
upon the installation condition and usage but should be carried
out annually. It is the law that any service work must be carried
out by a CORGI registered installer. In IE service work must be
carried out by a competent person.
1. Light the boiler and carry out a pre-service check, noting
any operational faults.
2. Check the gas consumption.
3. Connect a suitable gas analyser to the sampling point on
top of the boiler or into the flue terminal, if access is
possible. Refer to Frame 44.
For correct boiler operation the CO/CO
gas should not be greater than 0.004 ratio. If this is the
case, and the gas input is at least 90% of the nominal,
once compliance with the note above is ensured, then no
further action need be taken. If not, proceed to step 4 .
4. Clean the main burner.
5. Clean the heat exchanger and 'S' trap.
6. Check the condition of the combustion chamber
insulation. Any cracked or damaged pieces should be
replaced (HE15, HE18 and HE24 only).
7. Check the main injector for blockage or damage.
44 BOILER FRONT PANEL REMOVAL
1. Remove the two screws retaining the lower
front panel and remove the panel.
2. Remove the two screws retaining the upper
front panel.
3. Lift the upper front panel and remove.
32
SERVICING
8. Wherever possible, remove and clean the condensate 'S'
trap (refer to Frame 48) and check the drain for blockage.
9. Check that the flue terminal is unobstructed and that the flue
system is sealed correctly.
10. If fitted, clean the condensate pump.
The servicing procedures are covered more fully in Frames
46 to 50 and MUST be carried out in sequence.
Note. In order to carry out either servicing or replacement of
components the boiler front panels, and sealing panel must be
removed. Refer to Frames 44 and 45.
WARNING.
Always turn off the gas supply at the gas service
cock, and switch off and disconnect the electricity
ratio of the flue
supply to the appliance before servicing.
2
IMPORTANT.
11. After completing the servicing or exchange of components
always test for gas soundness and carry out functional
checks as in paragraphs 2 and 3.
12. When work is complete the sealing panel MUST be correctly
refitted, ensuring that a good seal is made.
DO NOT OPERATE THE BOILER IF THE SEALING
PANEL IS NOT FITTED.
13. Complete the service section of the Benchmark
Commissioning Checklist.
CO/CO
sampling
point
1
2
3
2
mexico HE -
Installation & Servicing

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

He24He18He30He36

Table of Contents