IDEAL HE15 Installation And Servicing page 16

Mexico he
Table of Contents

Advertisement

13 FITTING AND CONNECTING THE PRE-PIPING FRAME/CONDENSATE PIPE
SUPPORT BRACKET
1. Determine the position required for the boiler and tape template into place.
Note.
The template gives positions for both wall or flush with 600mm deep kitchen
units and the positional options of the condensate pipe bracket dependant
upon boiler size. To facilitate upward routing of pipework behind boiler,
position the template 40mm (minimum) away from the back wall.
2. Using the floor template, mark the pre-piping frame fixing holes,
the boiler fixing holes, the condensate pipe support bracket
fixing holes and the flue hole (refer to Frame 14).
3. Drill the 4 holes in the floor and screw the pre-piping frame
in place.
4. Drill the 2 holes in the floor and screw the condensate pipe
support bracket in place. If the condensate pipe is to be
fitted through the rear wall then fit a short piece of plastic pipe
to the bracket and mark the wall for drilling. Refer to Frame 15 for
condensate drain detail. When complete retain condensate pipe with
bracket clamp and fixing screws, protruding 20mm as shown.
5. The gas, water flow and water return can now be connected.
Note.
Measure and cut out flue hole using template (Refer to Frame 14).
14 FLUE HOLE TEMPLATE
IMPORTANT. Ensure that, during the cutting
operation, masonry falling outside of the
building does not cause damage or personal
injury.
Note.
The template shows the position of the flue
hole centres lines. (Flue options can be flush
to wall or in line with 600mm deep kitchen
units)
1. Extend flue centre line vertically, (for rear,
left or right as appropriate), up to 690mm
(centre line of flue).
2. Mark onto the wall the position of the flue
duct hole.
3. Cut the flue hole preferably with a 125mm
(5") coreboring tool, ensuring that the hole
is square to the wall.
4. Remove the template from the floor.
16
INSTALLATION
127mm (5") dia.
flue hole
690mm
1
(27
/
")
4
20mm
Clamp
Condensate
pipe support
bracket
C for boiler pushed
L
back to wall
Note. If only the terminal pack
'B' is used (up to 775mm) no
flue incline is required.
mexico HE -
Installation & Servicing
Pre-piping
Frame
mxhe7983

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

He24He18He30He36

Table of Contents