Replacement Of Components - IDEAL isar HE24 Installation And Servicing

Hide thumbs Also See for isar HE24:
Table of Contents

Advertisement

back

57 REPLACEMENT OF COMPONENTS

GENERAL
When replacing ANY component
1. Isolate the electricity supply.
2. Turn off the gas supply.
3. Remove the boiler front panel. Refer to Frame 49.
After replacing ANY component check operation of the boiler,
including gas soundness, gas rate and combustion test.
THE BOILER MUST NOT BE OPERATED WITHOUT THE SEALING PANEL FITTED
58 DRY FIRE THERMISTOR REPLACEMENT
1. Refer to Frame 57.
2. Remove the boiler front and sealing panels. Refer to
Frames 49 & 50.
3. Drain down the boiler. Refer to Frame 77.
4. Unplug the electrical lead.
5. Unscrew the thermistor.
6. Fit the new thermistor using the sealing washer
provided.
7. Reassemble in the reverse order.
8. Check the operation of the boiler.
59 FAN REPLACEMENT
1. Refer to Frame 57.
2. Remove the boiler front and sealing panels. Refer to Frames
49 & 50.
3. Disconnect the electrical leads from the fan.
4. Undo the gas pipe union connection to the injector housing.
5. Remove the screw retaining the fan mounting bracket.
6. Remove the fan and venturi assembly. Refer to
Frame 52.
7. Unscrew the 3 screws and remove the venturi
assembly, noting the orientation of the venturi in
relation to the fan body.
8. Transfer the venturi assembly to the new fan,
replacing the gasket if evidence of damage or
deterioration is visible.
9. Fit the new fan / venturi assembly.
10. Reassemble the boiler in reverse order, taking care not to
overtighten the screw on the fan mounting bracket.
11. Check the operation of the boiler. Refer to Frame 57.
isar -
Installation and Servicing
SERVICING
IMPORTANT.
When work is complete, the sealing panel, if removed, must
be correctly refitted - ensuring that a good seal is made.
Notes.
1. In order to assist fault finding, the control panel has an
LED diagnostic display. The key to boiler fault conditions
is shown in Frame 84.
2. In order to replace components in Frames 74-82 it is
necessary to drain the boiler. Refer to Frame 77.
3
5
nm8766
Orifice plate
Gasket
7
Ecl 2373
4
43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isar he35He30

Table of Contents