IDEAL HE15 Installation And Servicing page 15

Mexico he
Table of Contents

Advertisement

11 UNPACKING
The boiler is supplied fully assembled in one Pack A, together with a
standard flue assembly for lengths up to 650mm, rear or side flue
outlet, in Pack B.
Unpack and check the contents.
Pack A Contents
A The boiler
B These Installation & Servicing/
User Instructions
C Floor standing template
D 1 year guarantee form
E Hardware Pack Box
Hardware Pack Box Contents (E)
A Pre-piping frame
B Flue turret
C Screws - 4 off
D Gasket
E Flue connector
F Screws - 5 off
G Condensate Pipe Bracket
H Flue turret lubricant
I
Sealing washers - 3 off
(1 x
/
" gas and 2 x 22mm water connection)
1
2
Pack B Contents
Flue terminal
12 PACKAGING REMOVAL
1. Fold back the top flaps and remove outer sleeve.
2. The Installation & Servicing/Users Instructions can
be found on top of the boiler.
3. Remove wood screw at bottom rear of boiler,
retaining the hardware pack box and remove box.
4. When the boiler is to be fitted to the pre piping
Frame (refer to Frame 21) remove the top and inner
sleeve and the boiler from its wooden base.
The inner sleeve can be used to protect the floor
when fitting the boiler to the pre-piping frame.
mexico HE -
Installation & Servicing
INSTALLATION
A
B
A
E
mxhe7982
D
C
E
B
I
G
F
mxhe7658
1
4
H
C
D
F
3
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

He24He18He30He36

Table of Contents