Installation - IAG IOM75S User Manual

750mm electric built-in oven
Table of Contents

Advertisement

Installation

Important: the power supply to the appliance must be cut off before any adjustments or
maintenance work is done on it.
Installation of Built-in Ovens
To ensure the proper working order of the built-in appliance, the kitchen unit must be of a suitable size.
The sizes of the unit for installing the cooker under a worktop or in a column unit are shown in figure.
To provide adequate ventilation, there must be appropriate ventilation openings in the front bottom and the top part of
200 cm2 , and an exhaust opening on the bottom of an least 200 cm2 , and an exhaust opening of at least 60 cm2 .
The unit panels next to the cooker must be heat resistant. In the case of veneered wood units, glues must be resistant to a
temperature of 120°C.
In accordance with safety standards, once the appliance has been mounted, there must be no possible contact with
electrical parts. Any protective parts must be secured so that they can only be removed with the use of tools.
º
22 IAG 750mm Oven INSTALLATION

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents