Installation Sequence; Ball Bearing Slide Rail Rack Installation - Rorke Data GalaxyNASLX2 Configuration And System Integration Manual

Galaxy lx2 series
Table of Contents

Advertisement

G A L A X Y N A S L X 2
C O N F I G U R A T I O N

1.4.2 Installation Sequence

CAUTION It is strongly recommended to securely fasten the mounting rack to
the floor or wall to eliminate any possibility of tipping of the rack. This is especially
important if you decide to install several GalaxyNASLX2 chassis' in the top of the
rack.
A brief overview of GalaxyNASLX2 installation follows:
1. Select an appropriate site for the rack.
2. Unpack the server and rack mounting hardware.
3. Attach the rack mounting hardware to the rack and to the server.
4. Mount the server into the rack.
5. Connect the cables.
6. Turn on and initialize the server.

1.4.2.1 Ball Bearing Slide Rail Rack Installation

Unpack the package box and locate the materials and documentation necessary for
rack mounting. All the equipment needed to install the server into the rack cabinet is
included.
Follow the instructions for each of these illustrations
Kit Contents: the rack mounting kit include:
19
A N D
S Y S T E M
I N T E G R A T I O N
G U I D E
Section 1 Intro and Overview

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GalaxyNASLX2 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Galaxy lx series

Table of Contents