Operation Method
greater than 100V (lowest start-up voltage) but less than 150V (lowest operating voltage).
Checking:
Inverter will check output environment automatically when DC output
voltage of PV panels exceeds 150V and PV panels have enough energy to start inverter.
Normal:
Inverter begins to operate normally with green light on. Meanwhile, feedback
energy to grid, LCD displays present output power, inverter will stop feedbacks power to
grid when PV power is not enough.
7 Operation Method
7.1 Control Panel
Normal (green) :The inverter is working in normal state.
Fault (red) :The system is in fault state.
Function key :To check the operating data, detailed usage see section 7.2.
24
Note !
If inverter shows "Fault" status, please refer to Part 9.
LCD
Figure 20
Normal (green)
Control Panel
Fault (red)
Function key
24