Samil Power SP-SR-V5-EN Product Manual page 24

Solarriver pv grid-tied inverter
Table of Contents

Advertisement

Installation
Below shows the steps of wiring.
Step1:
Put the threaded sleeve and pressure screw through the AC wire (See figure 14).
Step2:
Wire the AC wire refer to below instructions.
·
Screw the green-yellow wire to the ground terminator in the AC Connector (Figure 15).
Screw the blue wire to the N(Neutral) terminator in the AC Connector.
·
·
Screw the brown wire to the L(Line) terminator in the AC Connector.
Step3:
Confirm all the wires should be screwed down( Figure 16).
Step4:
Screw down the threaded sleeve (Figure 17).
22
Figure 14
Figure 15 AC Connector
Figure 16
Figure 17

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SP-SR-V5-EN and is the answer not in the manual?

Table of Contents

Save PDF