Server blade signal
Mezzanine 2
Mezzanine 3
For detailed port mapping information, see the HP BladeSystem enclosure installation poster or
the HP BladeSystem enclosure setup and installation guide for your product on the HP website
(http://www.hp.com/go/bladesystem/documentation).
Installing the server blade into the enclosure
NOTE:
When installing additional blades into an enclosure, additional power supplies might
also be needed to meet power requirements. For more information, see the HP BladeSystem
enclosure setup and installation guide for your product on the HP website
go/bladesystem/documentation).
NOTE:
Before installing and initializing the server blade, install any server blade options, such
as an additional processor, hard drive, or mezzanine card.
NOTE:
Refer to the HP Integrity BL860c i2, BL870c i2 & BL890c i2 User Service Guide for
information regarding SAS controller configuration.
1.
Remove the connector covers if they are present.
2.
Prepare the server blade for installation.
c7000 interconnect bay
5 and 6
7 and 8
5 and 6
7 and 8
c3000 interconnect bay
3 and 4
3 and 4
3 and 4
3 and 4
Installing and powering on the server blade
Interconnect bay labels
(http://www.hp.com/
37
Need help?
Do you have a question about the Integrity BL860c i2 and is the answer not in the manual?
Questions and answers